Proposed improvements to Paddington War Memorial

A proposed upgrade to the Paddington War Memorial at 75B Oxford Street, Paddington.

Project Status: Closed

Public consultation period to

What we’re doing

The proposed design to upgrade the Paddington War Memorial will improve access for more people to visit.

The plan includes:

  • flagpole 
  • sandstone paving to match the current paving
  • sandstone retaining walls
  • plants and turf.

We will relocate the seat and pine tree. The other mature trees will be protected during this work.

Proposed concept designPDF · 269.19 KB · Last modified

How you can give feedback

Consultation closes at 5pm on Saturday 21 November.

There are 2 ways you can be involved and provide us with your feedback:


Feedback may be published in publicly available reports at the end of the consultation period. Your name or organisation's name may appear in these reports with your feedback attributed. If you would like your feedback to be kept confidential, please let us know when making your submission.

Other ways you can give feedback